For AI Agents
Hand your agent this brief or the ReUI MCP, not a screenshot. Installs with a ReUI Pro or Ultimate license.
Best for: A fleet wallboard of which services break their SLO first and how much traffic that puts at risk, with tier counts that tick live
When to use
- Rank shifts between 2 orderings of the same items, with each line weighted by the item's volume
- An SRE wallboard that ranks services by traffic against the days of error budget each has left
- A growth review that ranks acquisition channels by signups against the share of users each keeps
When not to use
- One objective's daily burn down with a forecast tail and a drag that sums spend: use the Error Budget Burn block
- A list of objectives, each row with a budget pin, a 28 day trend and a create dialog: use the SLO Budgets block
- Exact values for several series traced across many dates on a shared time axis: use the Line Chart blocks
- Volumes that merge and split as they flow from sources into costs, stages or outcomes: use the Sankey Chart blocks
- One value per item at a single moment, compared by length with no change in rank: use the Bar Chart blocks
Agent notes
- Replace
SERVICESin data.ts with your traffic, SLO, budget left and burn rates;burnAtfakes the live drift with a sine wave per service - A
setIntervaleveryLIVE_INTERVAL_MSbumpstick, andStatStripdiffsrunwaysAtagainst the tick before, so a real feed must keep its last snapshot exportCsvandcopySummaryconfirm through sonnertoast, so mount a Toaster, and the summary hardcodes the 7 day cutoff oftierOfCharttakes no props and fetches nothing, so every item, rank and value derives from constants in the block's data.ts- Each item is a Recharts
LinewhosedataKeyis its id and whose values are row indexes, bent into an S-curve by a customshape - Export CSV and the copy action confirm with sonner
toast, so the app needs a mounted Toaster for either message to show
Third-party API docs
- Recharts v3: API reference, docs
- Motion v12: API reference, docs (the docs follow the latest Motion, with no React API break since v12)
- Sonner v2: API reference, docs
https://reui.io/blocks/chart/slope-chart/chart-50.mdget_block("chart-50")npx shadcn@latest add @reui/chart-50Shadcn Components in the Error Budget Runway Block
Dependencies
- cn
- motion
- recharts
- sonner
Shadcn Error Budget Runway Block
Live error budget runway slope chart with traffic weighted lines and a current or baseline switch. Part of the ReUI Shadcn Slope Chart blocks collection.
Services ranked by traffic slope to their days of error budget left, re-sorting live as burn drifts, below 4 fleet stats with an inspector footer and CSV export. ReUI Frame, Badge; shadcn ToggleGroup, Progress; Recharts. SRE wallboard.
It is composed from Badge, Button, Chart, Dropdown Menu, Frame, Progress, Toggle Group, so every part of it is a primitive you can restyle with your own design tokens.
What You Can Build With the Error Budget Runway Block
- Install it with the ReUI registry command in the toolbar above, then swap the placeholder content, data wiring, and business logic for your own.
- Compare it across all eight ReUI styles and both the Base UI and Radix bases in the customizer before committing to one direction.
- Combine it with the other Shadcn Slope Chart blocks to assemble a full screen instead of a single section.
All Shadcn Slope Chart Blocks
The rest of this category, each on its own page with a live preview, the components it is built from, and the install command.
- Retention Crossover Channel retention slope chart with a day ruler re-ranking channels from signups to Day N retention
Related Shadcn Charts Block Categories
- Area Chart (4) Area chart cards with gradient fills, comparisons to a prior period or baseline, hover readouts and CSV export for trends over time.
- Bar Chart (12) Bar and column charts, stacked hourly outcomes, 3D prisms, diverging lanes and lollipop stems for comparing values.
- Composed Chart (5) Composed charts that layer areas and lines on one axis, with reference lines, goals and release markers.
- Line Chart (6) Line chart cards with single and multi-series lines, dual axes, reference lines and metric switchers.
- Pie Chart (2) Pie and donut chart cards with center totals, per-segment legends and period tabs for share of a whole.
- Radial Chart (3) Radial gauges with semicircle and full arcs, segmented rings and status labels for progress toward a target.
All Shadcn Block Groups
Browse the full ReUI Shadcn blocks library by product surface. Each group bundles category-level blocks you can mix and match across your project.
- Shadcn Application Blocks (303) Browse 303 Shadcn Application blocks across 23 categories.
- Shadcn Data Grid Blocks (43) Browse 43 Shadcn Data Grid blocks across 9 categories.
- Shadcn Charts Blocks (51) Browse 51 Shadcn Charts blocks across 10 categories.
- Shadcn Solutions Blocks (76) Browse 76 Shadcn Solutions blocks across 11 categories.
- Shadcn AI & Agents Blocks (18) Browse 18 Shadcn AI & Agents blocks across 2 categories.
- Shadcn eCommerce Blocks (87) Browse 87 Shadcn eCommerce blocks across 13 categories.
- Shadcn Marketing Blocks (67) Browse 67 Shadcn Marketing blocks across 8 categories.
Frequently Asked Questions
When should I use the Error Budget Runway block?
Use it for a fleet wallboard of which services break their SLO first and how much traffic that puts at risk, with tier counts that tick live.
The Slope Chart category fits:
- Rank shifts between 2 orderings of the same items, with each line weighted by the item's volume
- An SRE wallboard that ranks services by traffic against the days of error budget each has left
- A growth review that ranks acquisition channels by signups against the share of users each keeps
For one objective's daily burn down with a forecast tail and a drag that sums spend, use the Error Budget Burn block. For a list of objectives, each row with a budget pin, a 28 day trend and a create dialog, use the SLO Budgets block. For exact values for several series traced across many dates on a shared time axis, use the Line Chart blocks. For volumes that merge and split as they flow from sources into costs, stages or outcomes, use the Sankey Chart blocks. For one value per item at a single moment, compared by length with no change in rank, use the Bar Chart blocks.
What is the Error Budget Runway block built with?
Can I restyle the Error Budget Runway block?
How should I use Shadcn slope chart blocks in a real project?
Start building with ReUI Pro today.
Every Pro block, every style, and every future addition, with one license for unlimited projects.
From $249, once. Lifetime updates.