DocsSupportPricing
Roadmap (has updates coming soon)XFigma4.2K
Sign inGet All-Access
  1. Components

Free Shadcn UI Components

1265

Browse 1265+ free open-source shadcn/ui components for React and Tailwind CSS. ReUI helps you move from primitives to polished product UI with real examples for alerts, data grids, filters, event calendars, Gantt charts, file uploads, forms, navigation, and more.

Data GridEvent CalendarGanttCascaderFiltersKanbanFile UploadChart

Accordion

11 components

Alert

20 components

Alert Dialog

14 components

Aspect Ratio

8 components

Attachment

6 components

Autocomplete

12 components

Avatar

35 components

Badge

25 components

Breadcrumb

15 components

Bubble

7 components

Button

61 components

Button Group

57 components

Calendar

30 components

Card

18 components

Carousel

11 components

Cascader

21 components

Chart

25 components

Checkbox

22 components

Code Block

27 components

Collapsible

10 components

Color Picker

15 components

Combobox

28 components

Command

8 components

Context Menu

10 components

Data Grid

34 components

Date Selector

4 components

Dialog

10 components

Drawer

5 components

Dropdown Menu

18 components

Emoji Picker

8 components

Empty

20 components

Event Calendar

5 components

Field

11 components

File Type

15 components

File Upload

10 components

Filters

12 components

Frame

19 components

Gantt

Added a Working Days example, 8 in all
8 components

Hover Card

8 components

Icon Stack

6 components

Icon Tile

17 components

Input

31 components

Input Group

40 components

Input Otp

6 components

Item

12 components

Kanban

6 components

Kbd

6 components

Label

13 components

Marker

6 components

Menubar

5 components

Message

7 components

Message Scroller

6 components

Native Select

6 components

Navigation Menu

4 components

Number Field

6 components

Pagination

15 components

Phone Input

8 components

Popover

11 components

Progress

8 components

Questionnaire

7 components

Radio Group

17 components

Rating

9 components

Resizable

10 components

Scroll Area

5 components

Scrollspy

2 components

Select

33 components

Separator

6 components

Sheet

4 components

Sidebar

5 components

Signature Pad

12 components

Skeleton

10 components

Slider

12 components

Sonner

21 components

Sortable

8 components

Spinner

12 components

Stepper

44 components

Switch

14 components

Table

17 components

Tabs

9 components

Textarea

6 components

Time Picker

13 components

Timeline

12 components

Toggle

14 components

Toggle Group

16 components

Tooltip

16 components

Trace

22 components

Tree

7 components

Shadcn Components: Go Beyond AI Defaults

ReUI is an open-source component library for the shadcn/ui ecosystem. Every component is built from shadcn primitives, styled with Tailwind CSS, and composed inside realistic dashboard layouts, not isolated component playgrounds. Browse 1265 copy-ready catalog components and drop them directly into your React or Next.js project.

The library covers standard shadcn/ui components such as Button, Badge, and Dialog, plus 22 in-house custom components including Data Grid, Kanban, Filters, Event Calendar, Gantt, File Upload, Sortable, Timeline, and Stepper that extend the ecosystem beyond base shadcn/ui. All in-house components ship in both Radix UI and Base UI flavors.

Use the sections below to explore popular components, understand standard versus in-house components, check Shadcn Create compatibility, and compare Radix UI and Base UI variants.

What are ReUI Components?

ReUI components are reusable UI solutions composed from shadcn/ui components into real-world use cases: dashboards, forms, data views, and product flows, not isolated playground demos. Each component follows the shadcn copy-and-own model: the source installs directly into your repository via the shadcn CLI (npx shadcn@latest add). You own the code, customize it with your Tailwind CSS tokens, and extend it without version conflicts or package lock-in.

The difference between a shadcn primitive and a composed catalog component is scope. A primitive such as Button renders a styled, accessible element. A composed component is: a Data Grid row with inline editing, a Filters panel that persists state to the URL via nuqs, or a Stepper wired to per-step react-hook-form validation. Catalog components show how primitives combine inside production layouts.

Popular Components

Each entry links to the full component page where you can browse layouts, copy source code, and review component API documentation.

  • Shadcn Data Grid: @tanstack/react-table and @tanstack/react-virtual-powered tables with column pinning, row and column drag-and-drop via @dnd-kit/core, resizing, sorting, infinite scroll, and CRUD flows.
  • Shadcn Filters: Schema-driven filter panels with URL state via nuqs, zod validation, and multi-field types: text, select, multi-select, date range, and boolean.
  • Shadcn Kanban: Drag-and-drop task boards using @dnd-kit/core and @dnd-kit/sortable with dynamic overlays and composable card content.
  • Shadcn Event Calendar: Month, week, day, and agenda views with drag-and-drop scheduling, resource lanes, recurring events, and inline editing for planners and booking tools.
  • Shadcn Gantt: Project timelines with task trees, dependency bars, split panes, day-to-year zoom, and drag-to-reschedule editing for roadmaps and resource planning.
  • Shadcn Sortable: Vertical, grid, and nested list reordering with keyboard-accessible @dnd-kit/sortable drag overlays.
  • Shadcn Chart: recharts and motion-powered bars, areas, pies, radars, and animated dashboard visuals.
  • Shadcn Timeline: Deployment logs, activity feeds, milestones, and sequential event views in vertical and horizontal orientations.
  • Shadcn Stepper: Multi-step wizards and onboarding flows with per-step react-hook-form validation and progress indicators.
  • Shadcn File Upload: Dropzones, image previews, multi-file flows, and zod-validated upload inputs.
  • Shadcn Button, Shadcn Button Group: Primary actions, toolbars, loading states, and segmented controls: the largest component set in ReUI.
  • Shadcn Alert: Status banners, validation summaries, and inline feedback for success, warning, and destructive states.
  • Shadcn Combobox, Shadcn Autocomplete: Searchable single and multi-select components with async filtering and keyboard navigation.
  • Shadcn Calendar: Date ranges, preset shortcuts, and react-day-picker-based localization.
  • Shadcn Tree: Expandable hierarchies and file-style navigation built on @headless-tree/react.
  • Shadcn Rating: Star and icon-based rating inputs with half-star, read-only, and custom icon support.
  • Shadcn Input OTP, Shadcn Phone Input, Shadcn Number Field: Verification codes via input-otp, international numbers via react-phone-number-input, and numeric spinbuttons.
  • Shadcn Carousel: Sliders, thumbnails, and media galleries powered by embla-carousel-react.
  • Shadcn Dialog, Shadcn Select: Modal overlays and single-select dropdown fields.
  • Shadcn Badge: Status labels, tags, and count chips: available as an in-house component with extended variants.

Shadcn Components vs. In-House Components

ReUI components fall into two categories. Standard shadcn/ui components such as Button, Dialog, and Table extend base shadcn/ui primitives with production-ready layouts you will not find in minimal docs demos. In-house components such as Data Grid, Kanban, and Filters are built and maintained by the ReUI team for dashboard-grade workflows not covered by base shadcn/ui.

All in-house components follow the shadcn copy-and-own installation model and ship in two API flavors: a Radix UI version for teams using Radix-based shadcn primitives, and a Base UI version for teams using @base-ui/react. Both versions share identical Tailwind CSS styling; only the underlying headless primitive differs. Each has dedicated documentation covering the full component API, prop references, and usage examples.

Shadcn Create Compatibility

All ReUI components are fully compatible with Shadcn Create. The 8 named themes (Vega, Nova, Maia, Lyra, Mira, Luma, Sera, and Rhea) and the style controls for Radius, Font Family, Base Color, and Color Scale propagate to every component preview. The component source you copy uses the same CSS variable tokens, so what you see in the preview is exactly what you get in your project.

This applies to both standard and in-house components. In-house components like Data Grid and Kanban reference the same --radius, --background, --foreground, and --primary tokens that Shadcn Create writes to your globals.css.

Radix UI and Base UI Compatibility

ReUI supports both major headless stacks in the React ecosystem. Standard shadcn/ui components follow Radix UI primitives. In-house components that need headless state are offered in both Radix UI and Base UI API versions via @base-ui/react, with the same Tailwind styling and layout expectations.

Teams migrating from Radix UI to Base UI, or starting a new project with Base UI, can use the Base UI variants without redoing your theme or markup. In-house component documentation at ReUI Docs explains both API options with prop references and usage examples.

Frequently Asked Questions

What is the difference between a ReUI component and a shadcn/ui component?

A shadcn/ui component is a primitive: Button gives you a styled, accessible element. A ReUI component is a composed solution built from one or more shadcn primitives for a real product use case: a filterable data grid, a multi-step onboarding wizard, or a drag-and-drop kanban board. Catalog components show how primitives wire together inside production layouts, not how a single primitive renders in a sandbox.

How is ReUI different from shadcn/ui itself?

shadcn/ui provides the primitive components and the CLI install model. ReUI builds on top of that foundation: it adds 1265 composed components, 22 in-house custom components not in base shadcn/ui (Data Grid, Kanban, Filters, File Upload, Sortable, Timeline, Stepper, and more), and presents everything inside realistic dashboard frames rather than isolated demos. If shadcn/ui is the ingredient kit, ReUI is the recipe collection.

Do I need to install an npm package to use ReUI components?

No. ReUI follows the shadcn copy-and-own model: there is no @reui npm package to install. You add individual components via the shadcn CLI (npx shadcn@latest add), and the source files land directly in your repository. Some components pull in well-known third-party packages like @tanstack/react-table, @dnd-kit/core, or recharts, but ReUI itself adds no versioned dependency to your lockfile.

Can I use just one or two components without copying the whole library?

Yes. Components are fully independent. You can copy a single Data Grid component, a single Stepper variant, or any specific layout you need. There is no global install step and no ReUI runtime. Each component brings only the source files and third-party dependencies it actually needs.

When upstream shadcn/ui or ReUI updates a component, do my files auto-update?

No. You own the files after install. Treat updates like internal code: review changelogs, merge diffs, or re-run the CLI for a fresh copy and resolve conflicts. This is the explicit trade-off of the copy-and-own model: you gain full control and zero lock-in, and you take responsibility for managing updates on your own schedule.

I pasted a component but it does not match the ReUI preview. What should I check first?

Compare your theme tokens. Previews assume the same CSS variables (--background, --foreground, --primary, --radius, and the related color scales and font stacks) as a configured Shadcn Create theme. If globals.css is missing variables, imports differ, or you trimmed wrapper classes from the snippet, layout and color will drift. Align tokens first, then compare class-for-class.

Radix UI version or Base UI version for an in-house component: how do I choose?

Match the headless stack you have already standardized on. If your project uses Radix-oriented shadcn primitives throughout, stay with the Radix UI variant for fewer mental models and dependencies. If you are building with @base-ui/react or migrating toward Base UI, take the Base UI variant. The visual output is identical: only the primitive API and dependency graph differ. You can see both options in ReUI Docs.

Are ReUI components compatible with Next.js App Router and server components?

Yes. Components that use state, effects, or event handlers are client components and include the 'use client' directive. Purely presentational components can render server-side. The shadcn CLI adds files to your project as source, so you decide where each component sits in your rendering boundary. All Tailwind styling and token-based theming work regardless of whether you use the App Router or Pages Router.

Can I ship a closed-source SaaS product that includes ReUI components?

Yes. ReUI is MIT licensed. You may use, modify, and distribute copied source in proprietary or commercial products without publishing your application code. Keep the copyright notice in any license files where the MIT license requires it; beyond that, there are no restrictions on commercial use.

Start building with ReUI Pro today.

Every Pro block, every style, and every future addition, with one license for unlimited projects.

Get All-Access

From $249, once. Lifetime updates.

Application

  • App Shell
  • Auth
  • Card
  • Dashboard
  • Dialog
  • Empty State
  • Event Calendar
  • Flow
  • Form
  • Gantt
  • Kanban Board
  • List
  • Navbar
  • Onboarding
  • Profile
  • Rich Text Editor
  • Schedule
  • Settings
  • Sheet
  • Stats
  • Timeline
  • Whiteboard
  • Wizard

Data Grid

  • Base
  • AdvancedAdded 13 new Data Grid Advanced blocks, 30 in all
  • Columns
  • Drag & Drop
  • Editing
  • Expansion
  • Filtering
  • Grouping
  • Virtualization

Charts

  • Area Chart
  • Bar Chart
  • Composed ChartAdded a revenue map of sales regions
  • Line Chart
  • Pie Chart
  • Radial Chart
  • Sankey Chart
  • Slope Chart
  • Sparkline
  • Status TrackerAdded a team working agreements heatmap

AI & Agents

  • AI Chat
  • Agent Activity
  • AI Usage

Solutions

  • Dev Ops
  • AI Ops
  • CRM
  • Agents
  • Analytics
  • Billing
  • Bookings
  • Files
  • Inventory
  • Map
  • Travel
  • Users
  • Digital Twin

Templates

  • E-commerce
  • SaaS
  • Dashboard
  • Landing
  • All templates

eCommerce

  • Category Card
  • Checkout
  • Comparison
  • Coupon
  • Filter Sidebar
  • Product Card
  • Product Detail
  • Product Grid
  • Receipt
  • Review
  • Shopping Cart
  • Wishlist
  • Shop Hero

Marketing

  • Blog
  • Compare
  • Contact
  • CTA
  • FAQ
  • Hero
  • How It Works
  • Pricing

Resources

  • Components
  • Blocks
  • Icons
  • MCP for Agents
  • Docs
  • Support
  • Pricing
  • Tailwind Plus Alternative
  • Roadmap(has updates coming soon)
  • AffiliateSoon

Legal

  • Privacy Policy
  • Terms & Conditions
  • License
  • Refunds
  • Cookies

© 2026 ReUI. All rights reserved.

4.2K